Dongyang Huatong Pig Slaughtering Cold Chain Processing Base
Case Introduction: Dongyang Huatong Pig Slaughtering Cold Chain Processing Base
Construction time: December 10, 2023, Dongyang City, Jinhua, Zhejiang Province.
Project Overview: The project covers an area of 30000 square meters and includes a civil structure warehouse. It involves multiple functional areas, including a processing workshop, wholesale hall, first stage pre cooling, second stage rapid cooling, acid discharge, quick freezing, and low-temperature refrigeration.
Construction period: 90 days, commissioning and cooling period: 30 days.
Equipment parameter information:
The refrigeration system adopts a German Bitzer semi enclosed screw parallel compressor unit matched with an outdoor evaporative condenser for heat dissipation: the indoor system uses a ceiling mounted air cooler with aluminum bars, which uses hot fluorine defrosting and water flushing methods, and the aluminum bars use hot fluorine defrosting methods.
The operating conditions are -10 ℃/35 ℃- 28 ℃/35 ℃- 42 ℃/35 ℃
There are many types of library warm zones.
The project adopts a centralized control system, refrigeration cloud, and is designed to have a service life of 20 years.
Applicable to the field of poultry and livestock slaughter
Get a Free Quote
Please leave your contact information and requirements and we will arrange for a staff member to contact you.